Minneapolis Erosion Control Permit Fee Schedule
......
 Collaboration powered by Smartsheet   |   Report Abuse
1
Land Disturbing Activity(Non-Wrecking)
Type of workFee
2
Single Family Construction 501 to 3,000 square feet$129.00
3
Single Family Construction 3,001 square feet or more, for each
additional 1,000 square feet
$41.40
4
Multi-family, Commercial/Industrial greater than 500 square feet$426.70
5
Multi-family, Commercial/Industrial greater than 5,000 sq. ft.
Erosion Control Plan required
Public Works stamp required
$426.70
6
7
Land Disturbing Activity (Wrecking)
Type of workFee
8
Single-family residential greater than 500 square feet$129.00
9
Multi-family, Commercial/Industrial greater than 500 square feet$258.10
10
Multi-family, Commercial/Industrial greater than 5,000 sq. ft.
Erosion Control Plan required
Public Works stamp required
$258.10