25014 Project Journey
_______
 Collaboration powered by Smartsheet   |   Report Abuse
1Type:Address:
2Accessory Other3322 Sahalee Dr W, Sammamish, WA
3ServiceNotesYour Delivery
4DanforthHoliday Email Sent
Waiting on Geotech. -
Need Arborist TBD - Wild Goose Chase by CIty Code - City not clear
5JRNL
6Current06/16/25
7EX: Site Visit
8ex: City Guidelines07/08/25
9EX: DraftingDRAFTING SCOPE:
Existing garage walls will be demolished so we only need draw the permiter of the garge and the garage and man door openings. Existing foundation and slab will be re-used. (we will need to verify foundation size with a shovel at some point). At the existing home just draw the corner of the home. (see mark-up on drive)

We will need existing exterior elevation of the house drawn. However I did not measure the existing house as the homeowner may have some floor and site plans that can help.
10EX: Drone
11EX: Site Plan05/06/25
12EX: Site Tech
13How much $? (R O M)Homeowners to engage with builders for pricing
14visualsVisuals are complete. Any further updates to plans as necesary should be incorporated into the permit drawings.08/08/25
15BIDHOMEOWNER TASK
Plans have been issued for homeowner to get final bids.
16DETAILED DESIGNHOMEOWNER TASK
Homeowner to schedule a time to review exterior facade modifcations with the team
17Landscape
18FINANCEConsultant
19PERMIT DRAWINGS
20Arborist
21AsbestosConsultant
22Asbestos Abatement
23CivilConsultant
24Field Verifcation
25Geo-techConsultant
26SepticConsultant
27Structural
28Surveyor
29PERMIT SERVICESPreparing Drawings for Re-Submission, Awaiting reports from client and from DOB reviews
30External FeesPermit fees and consultant fees to be paid directly to consultant or city.
31Zoning Chart
32SHOPPING LISTList and quantites of all finish materials, fixtures and equipment required. Actualluy specifications of items will not be include unless it is required for buildling permit.
33STEP 4: BUILDGC Selected
Mark Kovats
Sammamish Remodel
4259996996
mkovats@sammamishrcb.com
Construction support services are available as needed
Start Date TBD
34BUILDSupport the BUILD team as necessary.
35PURCHASINGSupport the final order and deliver process as necessary.