2024 - 2025 City of Tacoma Project Forecast List
Primary ColumnDepartmentProject TitleProject DescriptionEstimated ValueAnticipated Post DateProject Location (Zip Code)
 Collaboration powered by Smartsheet   |   Report Abuse
1
Construction (Public Works and Improvement)
Public Works6th Ave & S 19th St Railroad Crossing ImprovementsPedestrian rail crossing improvements are planned at both the 6th Avenue and S. 19th Street rail crossings. Select improvements include upgraded railroad signals, relocated vehicle railroad gates, the installation of new pedestrian railroad gates, sidewalks, curb ramps, pavement replacement, pavement markings/crosswalks, landscaping, signage and fencing.$730,000.00Q3 202498465
2
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 24 & 35This street paving (maintenance) project will be completed in conjunction with capital improvements associated with the Local Improvement District program.$2,500,000.00Q1 202498407
3
Construction (Public Works and Improvement)
Public WorksPrairie Line Trail Phase IIThis project will create a 1/3 mile long pedestrian and bike trail along the former BNSF Railway line running from 21st to 23rd. Plantings, storm water improvements, and lighting will be part of the project.$7,275,000.00Q1 202498402
4
Construction (Public Works and Improvement)
Public WorksS 21st St & C St Signal ProjectThis project will replace traffic signals and update pedestrian infrastructure. New signal assets will include signal poles, push buttons, circuitry, and conduit. Curb ramps will be updated as needed for ADA compliance.$905,000.00Q2 202498402
5
Construction (Public Works and Improvement)
Public WorksSt Helens Ave OverlayThe project includes construction on St. Helens Avenue, from 6th Avenue to Division Avenue, including the intersection of 6th Avenue. Improvements will consist of an asphalt grind and overlay from curb face to curb face along with bulbouts at the intersections and installation of active transportation features (bike facilities and crosswalks).$1,499,000.00Q1 202498402
6
Construction (Public Works and Improvement)
Public WorksTPU South 17th St Court D/E InfrastructureThis project involves installing Tacoma Power utility vaults and duct banks.$820,000.00Q2 202498402
7
Construction (Public Works and Improvement)
Public WorksHistoric Water Ditch Trail Phase IIIAThe project will increase non-motorized or active transportation access along South Tacoma Way by constructing a shared-use path between “M” St. and Sprague. Construction funding is available fourth Quarter 2023.$7,000,000.00Q2 202498409
8
Construction (Public Works and Improvement)
Public WorksS Cedar St Active Transportation ImprovementsMarked crosswalk, pedestrian crossing advance stop bars, rectangular rapid flashing beacons, lane width reduction, road reconfiguration, median channelization/turn restrictions, ADA curb ramp retrofits, audible pedestrian signal, bicycle wayfinding (signs and markings), buffered bike lanes, green pavement markings, one-way or two-way protected bike lane, sidewalk with curb and buffer, pedestrian countdown signal, bike signal detection, bike box, engineering investigation re: speed limit & bike ramp$1,100,000.00Q4 202598421
9
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 23Crews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$3,810,630.00Q4 202398405/98406
10
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 32ACrews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$2,700,000.00Q1 202498405
11
Construction (Public Works and Improvement)
Public WorksE 38th St (Portland-SR 7) OverlayCrews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$983,742.00Q2 202498404
12
Construction (Public Works and Improvement)
Public WorksE 64th St Phase IIThis project consists of replacing the pavement, adding bike lanes, replacing sidewalks and curb ramps to meet ADA standards, upgrading the stormwater system, upgrading the illumination system, and including LED lighting between McKinley and Portland.$6,000,000.00Q2 202498404
13
Construction (Public Works and Improvement)
Public WorksE Portland Ave (56-64) OverlayCrews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$600,000.00Q3 202498404
14
Construction (Public Works and Improvement)
Public WorksMcKinley Avenue OverlookThis project will depave and improve the overlook area along East 32nd Street and provide a useable, public greenspace for the community. Included in this project are a planted landscape area with a sidewalk pathway, interpretive signing, viewfinders, garbage cans, seating, streetlights, and defined parking spaces. This space will make use of the viewpoint and promote active transportation, improve safety and limit vehicular speeding, reduce littering, and build a cohesive sense of community. Future placemaking and arts will be incorporated throughout the project after construction is complete.$300,000.00Q2 202498404
15
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 15Crews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable. Scheduled for Spring 2024 through Fall 2024.$3,700,000.00Q2 202498404
16
Construction (Public Works and Improvement)
Public WorksS. Yakima Sidewalk & Birney Elementary Safe Routes To SchoolThis project consists of sidewalk improvements with an aim to provide an Americans with Disabilities Act (ADA) accessible route on S Yakima Avenue between S 67th St and S 70th St, near IDEA High School. This includes missing link sidewalk, ramp upgrades, and curb bulbs, as well as the construction of Rapid Rectangular Flashing Beacons. The work at the S Yakima Ave & 76th is aimed at providing safe routes to school for Birney Elementary School. The contractor for this project is Axum General Construction, Inc.$514,000.00Q4 202398408
17
Construction (Public Works and Improvement)
Public WorksSafe Routes To School: ManitouThis project will improve the school crossing by adding a raised crosswalk, Rectangular Rapid Flashing Beacons (RRFB), and lighting. The project will also add protected and buffered bike lanes and connect to the Scott Pierson Trail. This project was prioritized based on safety, equity, and connectivity metrics.$554,000.00Q1 202498409
18
Construction (Public Works and Improvement)
Public WorksSheridan Arterial Improvements Project - Phase 1This project will rehabilitate the roadway and add curb and gutter, sidewalks on the east side and a shared use path on the west side of Sheridan Ave. from S 72nd St to S 64th St. Utility improvements include Power pole relocation, Stormwater, Sanitary Sewer and Water improvements that will occur prior to the start of roadway construction. Other amenities include landscaping, trees and retaining walls.$4,700,000.00Q3 202498408
19
Construction (Public Works and Improvement)
Public Works6th Ave Pedestrian Crossing Safety ImprovementsThe City was awarded a Highway Safety Improvement Program (HSIP) grant to construct needed safety improvements at selected intersections along the 6th Avenue corridor between Jackson Avenue and Grant Avenue.$2,600,000.00Q2 202498405/98465/ 98406/98403
20
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 37Package 37 mainly involves the construction or replacement of concrete panels, curb ramps, and conduit in various locations across Tacoma.$3,600,000.00Q1 202498402/98409/ 98418
21
Construction (Public Works and Improvement)
Public WorksLinks to Opportunity - Transit Oriented Development- Package 5The project will enhance the corridor along Sound Transit’s Hilltop Tacoma LINK extension route to increase accessibility and safety for residents and businesses. The scope of the improvements includes varying sidewalk color and designs, pedestrian lighting, street furniture, wayfinding signage, bicycle facilities, local art, granite inscriptions and poetry, street trees, and landscaping. The project serves one of Tacoma’s oldest historically Black neighborhoods and business districts, and the design was informed by nearly two years of grassroots outreach to the Hilltop community. Downtown: On the Go!, Hilltop Action Coalition, and Tacoma Housing Authority all assisted in the outreach effort. The final design is informed and defined by the community that it will serve and will honor the history of the corridor.$2,000,000.00Q2 202498405
22
Construction (Public Works and Improvement)
Public WorksS J St Bicycle BoulevardThis project will construct a two-mile bicycle boulevard on J Street from N 3rd St to S 27th St, along with improved east/west bicycle connections via 6th Avenue, S 11th Street, Earnest S Brazill St, S 17th Street, and S 18th Street, to facilitate access to Sound Transit's Tacoma Link light rail (Link) and the Hilltop Business District.$5,000,000.00Q2 202498405/98409
23
Construction (Public Works and Improvement)
Public WorksPedestrian Accessibility- District 10This project will make improvements to and construct over 120 new ADA-compliant curb ramps, impacting 29 total intersections, that have been requested by people with disabilities and where there are identified barriers. This will improve access to between streets and sidewalks for people with mobility issues. This project will create an accessible, walkable, and equitable community within District 10.$2,500,000.00Q2 2024Various
24
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 18Crews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$2,000,000.00Q1 202598465
25
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 40This street paving (maintenance) project will be completed in conjunction with capital improvements associated with the Local Improvement District program. Crews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$2,200,000.00Q1 202598406/98465
26
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 28Crews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$1,800,000.00Q1 202598433
27
Construction (Public Works and Improvement)
Public WorksTacoma Spur Stadium NB/SB RampThe project will provide an enhanced driving surface on the Northbound and Southbound ramps to/from Interstate 705 and the Tacoma downtown area. This project will install a new cement concrete overlay on the ramp decks, new bridge deck expansion joints, and safety upgrades including a new crash attenuator at the beginning of the Northbound ramp.$4,300,000.00Q1 202598402
28
Construction (Public Works and Improvement)
Public Works38th and Cedar Street Crossing ImprovementsThe project will construct curb ramps, signal upgrades, and marked crosswalks at the South 38th Street and South Cedar Street intersection. Improvements will also address existing stormwater drainage concerns.$700,000.00Q1 202598409
29
Construction (Public Works and Improvement)
Public WorksHistoric Water Ditch Trail Phase IIIBConstruction funding is available fourth Quarter 2023. The project will increase non-motorized or active transportation access along between “M” St. and South Tacoma Way by constructing a shared-use path.$3,400,000.00Q1 202598409
30
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 30Crews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$4,500,000.00Q1 202598409
31
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 32BCrews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$2,500,000.00Q2 202598405
32
Construction (Public Works and Improvement)
Public WorksE Portland Ave (64-72) OverlayCrews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing surface. ADA curb ramp upgrades will also be made at this time if applicable.$1,000,000.00Q1 202598404
33
Construction (Public Works and Improvement)
Public WorksStreets Initiative Package 27Crews will grind out sections of pavement to make minor repairs and prepare the surface for the placement of a 2-inch layer of asphalt over the existing street surface. ADA curb ramp upgrades will also be made at this time if applicable.$1,615,000.00Q2 202598404
34
Construction (Public Works and Improvement)
Public WorksSafe Routes to School - Baker Middle SchoolThis project will improve safety and walkability by adding sidewalk with curb and gutter, ADA compliant curb ramps, bulb-outs, marked crosswalks with advanced stop bars, a rectangular rapid flashing beacon, and a hybrid beacon. Speed bumps will be added to lower vehicular speed, further improving safety for all non-motorized users. Bicycle safety will be improved using green pavement bicycle crossing markings and providing a protected bicycle boulevard conversion with wayfinding signs and markings. In addition to corridor improvements, walk/bike school events, encouragement activities, and safety education classes will be provided at the end of construction.$1,200,000.00Q2 202598408
35
Construction (Public Works and Improvement)
Public WorksLinks to Opportunity - Transit Oriented Development- Package 1The project will enhance the corridor along Sound Transit’s Hilltop Tacoma LINK extension route to increase accessibility and safety for residents and businesses. The scope of the improvements includes varying sidewalk color and designs, pedestrian lighting, street furniture, wayfinding signage, bicycle facilities, local art, granite inscriptions and poetry, street trees, and landscaping. The project serves one of Tacoma’s oldest historically Black neighborhoods and business districts, and the design was informed by nearly two years of grassroots outreach to the Hilltop community. Downtown: On the Go!, Hilltop Action Coalition, and Tacoma Housing Authority all assisted in the outreach effort. The final design is informed and defined by the community that it will serve and will honor the history of the corridor.$3,500,000.00Q3 202598405
36
Construction (Public Works and Improvement)
Public WorksS 25th St Traffic Safety EnhancementsThis project is approximately 1.3 miles in length and is located on S. 25th Street between the Scott Pierson Trail and Prairie Line Trail. The project includes installing bicycle facilities such as bike lanes, shared lane markings, parking protected bike lanes, bicycle wayfinding signage, green bike lane pavement markings, bike box, bike detection, and a shared use path. It also includes installing marked crosswalks and curb ramps, and implementing leading pedestrian intervals as needed at locations along S. 25th Street approximately between the Scott Pierson Trail and Hood Street. Project includes associated ADA and utility work as needed.$1,790,000.00Q2 202598405
37
Construction (Public Works and Improvement)
Public WorksFoss Waterway, Site 8 Building DemolitionProvide for the demolition of the existing structure on Development Site 8 on the Thea Foss Waterway, located at 1131 Dock Street.$300,000.00Q1 202498402
38
Construction (Public Works and Improvement)
Public WorksFire Communications, Sidewalk ReplacementProvide for sidewalk removal and replacements around the historic Fire Communication center, located at 415 Tacoma Avenue South.$170,000.00Q2 202498402
39
Construction (Public Works and Improvement)
Public WorksTacoma Municipal Building, Exterior RepairsProvide for cleaning and exterior repairs to the historic Tacoma Municipal Building, located at 747 Market Street.$2,800,000.00Q4 202498402
40
Construction (Public Works and Improvement)
Tacoma RailBlair Switch ProjectReplace 6 railroad turnouts on the Blair Penninsula.$930,000.00Q2 202498421
41
Construction (Public Works and Improvement)
Tacoma RailAnnie 1 and 2 Tracks UpgradesReplace Several turnouts, replace ties, and Pandrol curves.$2,800,000.00Q2 202498421
42
Construction (Public Works and Improvement)
Tacoma RailBuilding Roof RepairsInstall new roof on TR's main building.$350,000.00Q3 202498421
43
Construction (Public Works and Improvement)
Tacoma RailPort Road and Lincoln Ave Railroad Signal InstallationInstall new grade crossing signals on Port of Tacoma Road and Lincoln Ave.$2,600,000.00Q4 2024 / Q1 202598421
44
Construction (Public Works and Improvement)
Tacoma RailBattery Electric Locomotive ProjectPurchase 2 Battery Electric locomotives and charging equipment. Includes installation of charging equipment as part of a construction project.$12,700,000.00Q2 202498421
45
Construction (Public Works and Improvement)
Tacoma RailPurchase of a Railroad TamperPurchase a tamper for railroad track maintenance activities.$1,500,000.00Q3 202498421
46
Construction (Public Works and Improvement)
Tacoma RailBattery Electric Locomotive PurchasePurchase one Battery Electric Locomotive.$5,500,000.00Q3 202498421
47
Construction (Public Works and Improvement)
Environmental ServicesCTP Roof ReplacementsReplace aging roofs at multiple CTP buildings$2,526,596.00Q1 2024
48
Construction (Public Works and Improvement)
Environmental ServicesSWM Full Site Channelization & Asphalt RepairsNew channelization and asphalt repair$1,656,975.00Q1 2024
49
Construction (Public Works and Improvement)
Environmental ServicesCTP Thermophilic Digester Tower A Restoration and Improvements (Quad A)Rehabilitate and coat the existing concrete surfaces at the A Quad Towers at the CTP Thermophilic Digesters. Also install access hatches at ground level for maintenance access.$991,400.00Q1 2024
50
Construction (Public Works and Improvement)
Environmental ServicesMcKinley Side Sewer ReroutesInstallation of new side sewers on McKinley Rd in order to transfer services and abandon existing main on private property.$850,000.00Q2 2024
51
Construction (Public Works and Improvement)
Environmental ServicesNETP Trickling Filter UpgradeThis project will construct a new trickling filter, mechanical equipment upgrades, concrete coatings, and frontage improvements at the NETP.$9,500,000.00Q1 2025
52
Construction (Public Works and Improvement)
Environmental ServicesThea Foss Outfall 230A Maintenance & Repair ProjectOutfall 230A put in as part of the Jefferson and Hood Project has some erosion occurring under the discharge location. This project will provide improved armoring under the outfall discharge so the City can maintain it's environmental controls for the Thea Foss Waterway$350,000.00Q1 2024
53
Construction (Public Works and Improvement)
Environmental ServicesSW - Various area project, N I St, S 50th, S 15th, S 42ndReplace and upsize stormwater sewer pipes at various locations. Project will include required street restoration improvements.$1,000,000.00Q1 2024
54
Construction (Public Works and Improvement)
Environmental Services74th & Warner Utility ProjectThis project will replace approximately 5,850 linear feet of 8-inch diameter public sewer main in the vicinity of S. 74th & Warner. Project includes partnership with Water and Public Works.$3,276,000.00Q3 2024
55
Construction (Public Works and Improvement)
Environmental ServicesNE Tacoma Vault Cleaning & Access Road - 2025$250,000.00Q1 2025
56
Construction (Public Works and Improvement)
Environmental ServicesLeach Creek Stormwater Holding Basin Modifications & Maintenance RepairsThe objective of this project is to construct modifications to the berm area around the inlet structure, modify the alignment of the channel, modify the outlet structure, and convert a portion of the forested wetland to emergent wetland.$2,887,433.00Q1 2024
57
Construction (Public Works and Improvement)
Environmental ServicesSW Sewer Improvements - N 33rd and JunettNew storm sewer improvements to remove an open discharge and risk of hillside erosion above Schuester Parkway.$700,000.00Q2 2024
58
Construction (Public Works and Improvement)
Environmental ServicesLincoln Ditch MaintenanceVegetation and deposited sediment removal from approximately 2,400-lf of the Lincoln Ditch, restoring original design conditions. The project is immediately adjacent Lincoln Avenue from Milwaukee Way to Port of Tacoma Road$400,000.00Q1 2025
59
Construction (Public Works and Improvement)
Environmental ServicesSW CIPP 2024This project consists of the rehabilitation of 11,780 LF of 8-inch to 36-inch diameter stormwater mains in various Tacoma locations.$1,500,000.00
60
Construction (Public Works and Improvement)
Environmental ServicesWW CIPP 2024This project consists of rehabilitating various wastewater mains in various Tacoma locations.$1,950,000.00Q1 2024
61
Construction (Public Works and Improvement)
Environmental ServicesWW CIPP 2025Q1 2025
62
Construction (Public Works and Improvement)
Environmental ServicesS. 38th & TylerPervious concrete replacement with standard asphalt in S. 38th St. from S Mason Ave. to S. Tyler St.$250,000.00Q1 2024
63
Construction (Public Works and Improvement)
Environmental ServicesOn-call concrete joint repair, grouting, and epoxy coating - 2022-23 ExpenseOn-Call contract for concrete restoration at various ES facilities$450,000.00Q2 2024
64
Construction (Public Works and Improvement)
Environmental ServicesWW & SW Sewer Pipe Replacement - N 8th & PineSW main replacement and upsizing project.$1,330,000.00Q1 2024
65
Construction (Public Works and Improvement)
Environmental ServicesWW Sewer Pipe Replacement - Vicinity N 10th and StevensWastewater pipe replacement project in the vicinity of the intersection of N 10th Street and N Stevens Street. Additional wastewater partial pipe replacement in alley between N 14th and N 15th Street, between N Cedar and N Junett Street.$2,235,000.00Q4 2024 / Q1 2025
66
Construction (Public Works and Improvement)
Environmental ServicesWW - MH Installation South 18thThis project will install 2 manholes and roughly 30 LF of 30" storm sewer pipe.$250,000.00Q2 2024
67
Construction (Public Works and Improvement)
Environmental ServicesSW - N 38th and TylerThe project will generally consist of the replacement, installation, and abandonment of 710LF of SW Mains$480,000.00Q1 2024
68
Construction (Public Works and Improvement)
Environmental ServicesWW & SW 2023B WW & SW Utility Services On-CallA 2 year contract for emergency and non-emergency spot repairs on an as-needed basis from Asset Management and Transmission. If Transmission is overloaded with side sewer repairs, it can be sent to this contract.$650,000.00Q1 2024
69
Construction (Public Works and Improvement)
Environmental ServicesCTP Secondary Clarifier 4 & 6This project will replace the existing 1.5" grout layer on the bottom of the Central Treatment Plant secondary treatment tank and Epoxy inject and repair any cracks/spalls that have developed in the concrete.$3,100,000.00Q1 / Q2 2024
70
Construction (Public Works and Improvement)
Environmental ServicesNorthshore Golf Course Ponds MaintenanceMaintenance of 3 ponds located at the Northshore Golf Course$2,867,800.00Q1 2025
71
Construction (Public Works and Improvement)
Environmental ServicesCTP - Bldg A HVAC replacement all UnitsReplace (in-kind) the major heating, ventilation, and air conditioning (HVAC) components that service the building's occupied spaces. The equipment is beyond its useful lifespan and will begin to fail.$1,077,000.00Q2 2025
72
Construction (Public Works and Improvement)
Environmental ServicesCTP DAFT Odor Control System Rehab/Media Repl"
73
The existing CTP DAFT Odor Control scrubbers are nearing the end of their useful life. This project will include removal and replacement of the existing media, inspections and repairs of the scrubber tanks, air permit modifications (as needed), and overall upgrades to the system (e.g. pump replacements)."
$1,516,320.00Q2 / Q3 2025Yes
74
Construction (Public Works and Improvement)
Environmental ServicesCTP Thermophilic Digester Tower - Quad CRecoat the inside of each of the four tours, replace or rehabilitate the sludge distribution box, rebuild each of the mixers, recoat the handrails, replace the grating and drain piping, and repair the exterior Dryvit insulation system.$166,400.00Q4 2025
75
Construction (Public Works and Improvement)
Environmental ServicesCTP UNOX Tank 4113Rehabilitate the interior of the concrete UNOX basin. Repair all failed concrete patches, repair failed grout pads, recoat all corroded pipe supports, epoxy inject all interior and exterior cracks, rebuild all four mixer gearboxes and motors, recoat mixers with UV resistant coating.$2,916,000.00Q1 2025
76
Construction (Public Works and Improvement)
Environmental ServicesCTP Lincoln Ave Pipe BridgeReplace the existing debris structures with inert materials, recoat both wastewater pipelines, replace the existing air relief valves and piping expansion joints, and preform minor repairs to concrete structure.$3,000,000.00Q4 2025
77
Construction (Public Works and Improvement)
Environmental ServicesCTP Effluent River Outfall Vault"
78
Rehabilitate and recoat the plant effluent river outfall vault. As the structure is from the Phase I upgrade, it shows signs of severe abrasion and corroded anchors. It is two chambered, and the southern chamber has all CTP primary treatment effluent flows traveling through it under normal operation."
$165,946.00Q3 2025Yes
79
Construction (Public Works and Improvement)
Environmental ServicesCTP Tunnel RepairMiscellaneous structural and piping repairs within the subgrade process tunnel.$174,960.00Q4 2025
80
Construction (Public Works and Improvement)
Environmental ServicesAN3105 Picks Cove Pump Station RehabRehabilitate and coat the wet well, replace wet well piping, pumps, and pump rails. Install venting for wet well. Rebuild or replace generator (TBD by O&M), remove abandoned control panel$396,576.00Q2 2024
81
Construction (Public Works and Improvement)
Environmental ServicesAN4110 Overlook Pump Station RehabRehabilitate and coat the wet well, replace pumps and valves, replace VFD's.$536,000.00Q2 2025
82
Construction (Public Works and Improvement)
Environmental ServicesWW & SW Tacoma Ave N 1st to N 2nd"
83
Replace the sanitary and storm system between N 1st and N 2nd"
$118,000.00Q3 2025Yes
84
Construction (Public Works and Improvement)
Environmental ServicesStormwater Pond MaintenanceThis project will remove sediment and vegetation in various ponds throughout NE Tacoma and W Tacoma$288,900.00Q2 2025
85
Construction (Public Works and Improvement)
Environmental ServicesCTP - O2 Deck MetersReplace four 30" magnetic flow meters, four 36" influent isolation butterfly valves, four electronically actuated 36" discharge butterfly valves, Rotork valve operators, and the yard water pump discharge header pipeline. All of these assets are beyond their useful lifespan and are beginning to fail.$1,981,509.00Q1 2025
86
Construction (Public Works and Improvement)
Environmental ServicesWW - E Division and E F St area"
87
This project is to replace wastewater mains"
$560,000.00Q4 2024 / Q1 2025Yes
88
Construction (Public Works and Improvement)
Environmental ServicesWW - Various area Memorial Park and E K St"
89
This project is to abandoned and rebuild the system behind the old Dairy Queen at 1112 Puyallup Ave"
$751,000.00Q4 2025Yes
90
Construction (Public Works and Improvement)
Environmental ServicesWW - Wapato Area Main ReplacementReplace WW pipes due to poor conditions$1,000,000.00Q4 2025
91
Construction (Public Works and Improvement)
Tacoma WaterCP Anode WellsReplacing a CP anode well in the City of Enumclaw near Railroad St and Marshall Avenue.$250,000.00Q2 202498022
92
Construction (Public Works and Improvement)
Tacoma Water99th and Aqueduct/Vault/PRV replacementThe installation of a new pressure reducing valve station near 99th Street and And Aqueduct Dr E.$175,000.00Q3 202498445
93
Construction (Public Works and Improvement)
Tacoma WaterChemical Feed Lines at GRFFThis project consists of replacing all of the existing reinforced PVC lines from the chemical facility and the fluoride room at the Green River Filtration Facility (GRFF), through 17 chemical vaults (pull boxes) connected by secondary containment piping, to various injection points throughout the GRFF.$400,000.00Q1 202598051
94
Construction (Public Works and Improvement)
Tacoma WaterHeadworks Remodel & HVACRemodel of the Green River Filtration Facility Operations Center including the replacement of the existing HVAC system.$1,300,000.00Q2 202498051
95
Construction (Public Works and Improvement)
Tacoma WaterSI Package 40The project will replace approximately 4400 linear feet of 8" and 12" water distribution main and included as a part of the Street Initiative 40 road improvements. The cost estimate is for the water portion only.$1,025,175.00Q3 202498406
96
Construction (Public Works and Improvement)
Tacoma WaterCurran Road - Bingham and 47thThe project will replace approximately 4100 linear feet of 8" and 10" water distribution main.$1,700,000.00Q2 202498466
97
Construction (Public Works and Improvement)
Tacoma WaterSI Package 28The project will replace approximately 2500 linear feet of 8" and 12" water distribution main and included as a part of the Street Initiative 28 road improvements. The cost estimate is for the water portion only.$983,000.00Q2 202498421
98
Construction (Public Works and Improvement)
Tacoma WaterReroof 3.5 MG Indian Hill reservoirReplace the existing concrete reservoir roof hot mop pea gravel coating system with a new high performce coating system.$312,000.00Q2 202498422
99
Construction (Public Works and Improvement)
Tacoma WaterWater Ditch Trail Ph 3BThe project will replace approximately 3000 linear feet of 8" and 12" water distribution main and included as a part of the Water Ditch Traill 3b improvements. The cost estimate is for the water portion only.$900,000.00Q3 202598409
100
Construction (Public Works and Improvement)
Tacoma WaterSheridanThe project will replace approximately 3700 linear feet of 8" and 12" water distribution main and included as a part of the Sheridan Arterial Improvements Project - Phase 1 road improvements. The cost estimate is for the water portion only.$704,000.00Q3 202498408
101
Construction (Public Works and Improvement)
Tacoma WaterStreets Pkg 32 (S 12th, from Cedar to Sprague)The project will replace approximately 3400 linear feet of 8" and 12" water distribution main and included as a part of the Street Initiative 32 road improvements. The cost estimate is for the water portion only.$1,000,000.00Q2 202598405
102
Construction (Public Works and Improvement)
Tacoma WaterOzone System UpgradeReplacement of age Ozone equimpent components.$3,300,000.00Q2 202598051
103
Construction (Public Works and Improvement)
Tacoma WaterFilter Media ReplenishmentA contract to add filter media in the existing filters at the Green River Filtration Facility.$100,000.00Q3 202598051
104
Architectural & Engineering (A&E)
Tacoma WaterStructural Concerns on Elevated Pipeline 1 Supports near the Maintenance BridgeA professional service contract is needed to help Tacoma Water determine the extents of structural issues with pier supports on Pipeline No. 1. The supports are located alongside the maintenance bridge near the entrance to the Green River Filtration Facility.$50,000.00Q3 2024Study
105
Architectural & Engineering (A&E)
Tacoma WaterFixed Ladder & Anchor PointsA professional service contract is needed to design ladder replacements, anchorage points, verticle lifelines, and handrail at 9 Tacoma Water storage facilities.$15,000.00Q3 2024Sudy
106
Architectural & Engineering (A&E)
Tacoma WaterArc Flash StudyA professional service contract is needed to help Tacoma Water determine arch flash risks and mitigations in Water facilities.$77,500.00Q1 2025Study
107
Architectural & Engineering (A&E)
Tacoma WaterCascadia Reservoir and PSDesign and Permitting services is needed for a new reservoir and pump station to be built in the Tehaleh development.$560,000.00Q4 2024Sudy
108
Construction (Public Works and Improvement)
Tacoma PowerTPU Admin Complex Storage, Parking & South GateAn Alternative Public Works contract will be needed (drafted by third party counsel) to procure a Progressive Design-Build team to design, permit, and construct additional equipment & vehicle storage on the TPU Admin Complex. Additionally, this work will include the scope of new driveway accesses and a gatehouse along the new Access Road along the southern border of the property.$23,925,000.00Q2/Q3 2024
109
Construction (Public Works and Improvement)
Tacoma PowerTPU South Service CenterAn Alternative Public Works contract will be needed (drafted by third party counsel) to procure a Progressive Design-Build team to design, permit, and construct equipment & vehicle storage on the TPU South Service Center campus.$15,700,000.00Q4 2024/Q1 2025
110
Construction (Public Works and Improvement)
Tacoma PowerTPU Admin Building Atrium & Entry ImprovementThis project will include the replacement of the existing, historic entry curtainwall and entry.$1,639,000.00Q1 2025
111
Architectural & Engineering (A&E)
Public WorksImpact Fee StudyThis project will develop a proposed fee schedule, project analysis, and program implementation.$320,000.00Q1 202498402
112
113
114
115
116
117
118
119
120
121
ESTIMATED TOTAL VALUE$229,761,862.00