Fire Inspections License & Permit Fee Schedule
Permit, License, Registration, or Fee2023 Fee
 Collaboration powered by Smartsheet   |   Report Abuse
1
-Fire Protection Systems
2
Minimum (not base)
$75.40
3
Up to $500 valuation
$39.90
4
$500.01 - $2,000.00 valuation
$39.90 + $4.90 for each additional $1,000 and portion thereof, up to $2,000
5
$2,000.01 - $25,000.00 valuation
$113.40 + $23.20 for each additional $1,000 and portion thereof, up to $25,000
6
$25,000.01 - $50,000.00 valuation
$647.00 + $16.80 for each additional $1,000 and portion thereof, up to $50,000
7
$50,000.01 - $100,000.00 valuation
$1,067.00 + $11.50 for each additional $1,000 and portion thereof, up to $100,000
8
$100,000.01 - $500,000.00 valuation
$1,642.00 + $9.40 for each additional $1,000 and portion thereof, up to $500,000
9
$500,000.01 - $1,000,000.00 valuation
$5,402.00 + $7.80 for each additional $1,000 and portion thereof, up to $1,000,000
10
$1,000.000.01 valuation and higher
$9,302.00 + $6.30 for each additional $1,000 and portion thereof
11
-State Surcharge
12
Value Based Permits
.05% of the permit value
13
Fixed Fee Based Permit
If the fee is less than $2,010, the surcharge is $1. If greater than $2,010, .05% of the permit value.
14
Plan Review Surcharge
New buildings or remodeling of existing buildings require an additional plan review fee equal to 65% of the permit fee
15
Additional Plan Review Fee (additional review needed prior to or after start of initial plan review)
$65.00
16
-Special Event Permits
17
Amusement Building
$75.40
18
Bonfire (onetime)
$75.40
19
Controlled Burn
$75.40
20
Exhibits & Trade Shows
$150.70
21
Fireworks Display (proximate audience)
$150.70
22
Fireworks Display (outdoor/explosive)
$301.40
23
Open Flame or Candles in Assembly Area
$75.40
24
Pyrotechnical Effects
$150.70
25
Temporary Conditional Use
$150.70
26
Temporary Liquid Petroleum Usage
$75.40 per tank
27
Tent & Other Membrane Structure
$75.40
28
-Operational Permits
29
Blasting
$75.40
30
Cellulose Nitrate Film
$75.40
31
Combustible Dust
$75.40
32
Cutting and Welding
$75.40
33
Dry Cleaning Plants
$75.40
34
Explosives
$150.70
35
Firewood Storage
$75.40
36
Fumigation/Thermal Insecticides
$75.40
37
High Piled Storage
$150.70
38
Industrial Ovens
$75.40
39
Liquid or Gas Fueled Vehicle in Assembly
$75.40
40
Lumberyards/Woodworking
$75.40
41
Magnesium
$75.40
42
Ovens, Industrial Baking & Drying
$75.40
43
Private Fire Hydrants
$75.40
44
Rooftop Heliports
$75.40
45
Spraying and Dipping
$75.40
46
Tire Rebuilding
$75.40
47
Tires & Tire Byproducts
$75.40
48
Waste Handling
$75.40
49
Wood Products
$75.40
50
-Commercial Building Registration
51
0 - 5,000 square feet
$55.00
52
5,001 - 10,000 square feet
$100.00
53
10,001 - 100,000 square feet
$300.00
54
100,001 - 250,000 square feet
$500.00
55
250,001 - 1,000,000 square feet
$800.00
56
1,000,001 - 2,000,000 square feet
$1,000.00
57
2,000,001 square feet and over
$1,200.00
58
Late Fee
Add 25% to fee
59
-Hazardous Materials Permits
60
Code 1 Tier II / High Hazard
$515.50
61
Code 2 Medium Hazard
$278.00
62
Code 3 Low Hazard
$139.50
63
Late Fee
Add 10% to fee
64
-Tank Permits
65
Flammable Liquids, Install
$150.70 per tank
66
Flammable Liquids, Removal or Abandonment
$75.40 per tank
67
Flammable Liquids, Storage, Handling, or Use One Time
$150.70 per tank
68
Hazardous Substances, Storage or Handling
$116.00 per tank
69
Liquified Petroleum, Temporary
$75.40 per tank
70
Liquified Petroleum, Underground Install
$226.10 per tank
71
-Firewatch
72
Inspections outside normal business hours (four hour minimum)
$65.00 per hour
73
-Fire Pump
74
Flat fee for plan review and permit to replace existing pump or add new pump to existing system
$650.00
75
-Smoke Control
76
Flat fee for plan review and permit to replace an existing or add a smoke control system
$650.00