_Village Projects Status CIP all projects
Project NameProject DescriptionNext StepExpected Completion DatePlanningFundingGrants (If Applicable)Council ApprovalProcurementDesignConstruction ProcurementConstruction AwardedConstruction
 Collaboration powered by Smartsheet   |   Report Abuse
1
ONGOING PW CIP PROJECTS
2
Transportation Alternatives Program/FM#440843-1/N Miami Avenue from NE 91 Street to NE 111th Street Multimodal Mobility Improvements
The project provides enhanced safety and mobility for pedestrians and bicyclist by implementing neighborhood greenways, shared lane markings, high emphasize textured intersections, and bicycle and pedestrian crossing improvements.ProcurementWinter 2025100%100%100%100%100%100%100%100%0%
3
Local Agency Program/FM#441638-1/Multimodal Mobility
The project provides enhanced safety and mobility for pedestrians and bicyclist by implementing neighborhood greenways, shared lane markings, high emphasized textured intersections, and bicycle and pedestrian crossing improvements.ProcurementWinter 2025100%100%100%100%100%50%0%0%0%
4
Local Agency Program/FM#446054/NE 6th Avenue Pedestrian Promenade
The project involves expanding the existing sidewalk to create a wide multi-purpose path facility measuring 10 feet in width on both sides of NE 6th Avenue, stretching from NE 96th Street to NE 107th Street. This proposed initiative aims to enhance safety and mobility for pedestrians and bicyclists in the area.ProcurementSpring 2026100%100%100%100%100%100%25%0%0%
5
Local Agency Program/FM#447970-1/Flagler Trail Project
Eight-foot wide asphalt multi-purpose path along the west side of Club Drive between the roadway and the right-of-way line, along the Miami Shores Village (Village Flagler Trail on Club Drive, between 91st Street and NE 100 Street.DesignSpring 2027100%100%100%100%100%60%0%0%0%
6
Local Agency Program/FM#450906-1/NE 104th Street Roadway Improvements
The Village has divided the project into two parts. The first part involves optimizing the roadways' pitch to ensure proper water flow into street drains. This proposal pertains to the initial phase of the project, which is funded through the FDOT grant for Roadway Improvements (FM 450906-54-1, DOT Grant). While this phase will partially improve the drainage system in the area, a comprehensive analysis of the underground drainage system, funded under Dep Drainage Grant #LPA 0335, will connect with the proposed drainage in this proposal. Coordination between the two projects will be necessary.DesignSummer 2026100%100%100%100%100%60%0%0%0%
7
DEP Drainage Grant #LPA 0335/NE 104th Street Underground Drainage
The Village has divided the project into two parts. The second part involves addressing underground drainage system including collection, pre-treatment, and discharge will be included as part of the design. The project funded under Florida Department of Environmental Protection (DEP Drainage Grant #LPA 0335) and will address drainage specifically.DesignSummer 2026100%100%100%100%100%40%0%0%0%
8
Landscaping Project Biscayne Blvd from NE 91 Street to 104 Street
Landscaping design on Biscayne Blvd from NE 91st Street to NE 104th Street. This endeavor is being facilitated by the FDOT’s Beautification Grant initiative, which aims to improve the overall appearance of the entrance to Miami Shores Village.ProcurementFall 2025100%100%100%100%75%60%0%0%0%
9
NE 96th Street Roadway Improvements from NE 6th Avenue to NE 10th Avenue
Milling and resurfacing to include curb and guttersConstructionFall 2025100%100%100%100%100%100%100%100%75%
10
Shores Estate Septic to Sewer
Implementation from septic to gravity sewer conversion in the project area. Procurement is preparing recommendation award memo.ConstrucitonWinter 2025100%100%100%100%100%100%100%0%0%
11
105th Street Stormwater Pump Station
The project area consists of 99 homes that are bounded by NE 107th Street to the North, Biscayne Canal C-8 to the south, US 1 to the east. Project consists of roadway swale areas, retention areas, and limited Stormwater infrastructure to collect Stormwater runoff from the right of way along the edge of the roadways.On hold, pending fundingFall 2026100%100%100%100%100%100%0%0%0%
12
NE 8th Avenue Stormwater Drainage Project
Stormwater management system upgrades will include upsizing existing antiquated catch basins, additional catch basins as required, upgrading of piping to current hydraulic standards, French Drains, baffles on catch basins, outfall upgrades if required.Procurement10/30/25100%100%0%100%100%85%0%0%0%
13
NE 100th Street Spot Drainage Project
Spot drainage repair project in the vicinity of 1097 NE 98th Street. The project will include the addition of an exfiltration trench system to help dissipate stormwater runoff. The new system will be offset onto the street from the existing catch basins at the low point of the roadway and will connect to the existing catch basins. The catch basins may be upgraded as a result of the analysis if they are deemed unusable. Milling and resurfacing of the affected section of the roadway will be required.On hold, pending Stormwater MasterplanTBD100%100%0%0%100%90%0%0%0%
14
NE 98th Street Spot Drainage Project
Spot drainage repair project in the vicinity of 1097 NE 98th Street. The project will include the addition of an exfiltration trench system to help dissipate stormwater runoff. The new system will be offset onto the street from the existing catch basins at the low point of the roadway and will connect to the existing catch basins. The catch basins may be upgraded as a result of the analysis if they are deemed unusable. Milling and resurfacing of the affected section of the roadway will be required.On hold, pending Stormwater MasterplanTBD100%100%0%0%100%90%0%0%0%
15
Bayshore Park Seawall
Miami Shores Village is requesting statement of qualifications from qualified professionals to perform engineering design and architectural services, permitting application preparation, and construction phase engineering services and to assist in finalizing and implementing improvements to Bayfront Park.Procurement06/30/26100%75%0%100%100%100%90%0%0%
16
NE 95th Street Buffer Wall
Replacement of 1300LF of existing buffer wall and replacement with new buffer wall.ConstructionFall 2025100%100%100%100%100%100%100%100%50%
17
Speed Humps
We are incorporating speed tables in accordance with the 2016 Miami Shores Village-Wide Traffic Calming Study. This endeavor is designed to alleviate the impact of fast-moving vehicles within our neighborhoods. On-going.OngoingOngoing100%100%0%0%100%0%0%0%0%
18
Public Works Fuel Tanks Replacement Design
Miami Shores Village operates a fleet fueling facility at the Public Works Complex located at 1701 NW 103rd Street, Miami FL 33417. The existing underground fuel storage tanks, one (1) 4,000-gallon double wall gasoline tank and one (1) 4,000-gallon double wall diesel tank have approached the end of their service life.DesignSpring 2026100%100%0%0%100%15%0%0%0%
19
STUDIES AND MASTER PLANS
20
Stormwater Drainage Study Design
Proposal submittals were due Wednesday, June 5th, 2024. The awarded firm will provide professional engineering services for the planning and development of a comprehensive Stormwater Master Plan. This plan will offer a framework that encompasses the existing stormwater management program.PlanningFall 2025100%100%0%0%85%25%0%0%0%
21
Parks Master Plan
Our Parks Master Plan maps out the future of our community's green spaces. It envisions improved parks that cater to diverse needs, emphasizing nature preservation and community involvement. We aim to create vibrant, inclusive, and eco-friendly parks for everyone to enjoy, ensuring a better future for all.PlanningWinter 2025100%100%0%100%100%40%0%0%0%
22
Golf Course Assessment Report
Miami Shores Village has engaged the National Golf Foundation from Jupiter, FL, to evaluate necessary improvements for the golf course and overall facility to ensure the long-term sustainability of MSCC. NGF plans to conduct a comprehensive physical assessment of the MSCC facility, including the clubhouse. NGF will assist with various due diligence aspects and serve as an overall advisor to the Village as it makes key decisions regarding MSCC's capital investment and future management. NGF will provide a conceptual Golf Course redesign as part of the report.PlanningWinter 202560%0%0%0%0%0%0%0%0%
23
Septic to Sewer Study
Septic to Sewer Master Plan for the entire Miami Shores Village. Engineering firm awared.PlanningSummer 2025100%100%0%100%100%30%0%0%0%
24
COMPLETED PW PROJECTS
25
Vulnerability Assessment
Assessment of tidal, storm surge, rainfall, and groundwater flooding risks to infrastructure, residents, economy, and environment. Establishes baseline and future conditions per Florida Statute 380.093 to guide resilience planning.CompletedSpring 2025100%100%100%100%100%95%NANANA
26
Village Hall Interior Renovation
Interior renovations to include offices and outdated restrooms.Construction12/31/24100%100%0%100%100%100%100%100%90%
27
Tennis Courts Resurfacing
Resurfacing of the basketball courts for the Community Center, to include pickle ball courts.Completed07/31/24100%100%0%100%100%100%100%100%100%
28
Local Agency Program/FM#447983-1/ADA Ramp Improvements Project
The proposed projects provide enhanced pedestrian safety and mobility while improving ADA-compliant crosswalks along the Village’s local roadways. The 36 new curb ramps will improve pedestrian connectivity throughout the Village.Completed09/30/25100%100%100%100%100%100%100%100%100%
29
Doctor's Charter School Marque Sign
Illuminated double sided pylon sign with Daktronics BoardCompleted11/30/24100%100%0%100%100%100%100%100%75%
30
NE 96th Street Marquee Sign
Illuminated single sided monument sign with Daktronics BoardCompleted11/30/24100%100%0%100%100%100%100%100%75%